A985 Kincardine Bridge

17 February 2020

Overnight maintenance

ESSENTIAL MAINTENANCE ON A985 KINCARDINE BRIDGE COMMENCES 17th FEBRUARY

Essential maintenance on the A985 Kincardine Bridge will take place overnight, between 8pm and 6am, on Monday 17th February 2020.

The scheme will improve the condition of the bridge at this location, benefitting around 13,000 vehicles using this route each day, and reducing the need for future more extensive maintenance.

This work requires a full closure of the A985 at this location with a signed diversion route in operation.

Eastbound traffic will be diverted via the A876 Clackmannanshire Bridge from Higgins Neuk Roundabout. At Kilbagie Roundabout, vehicles will follow the A977 to Kincardine before returning to the A985 at Longannet (Toll) Roundabout.

Westbound traffic will follow the same diversion in the opposite direction.

Buses will follow the same diversion.

This scheme has been planned in consultation with Transport Scotland, Traffic Scotland, the emergency services, bus operating companies, road hauliers, Clackmannanshire, Fife, Stirling and Falkirk Councils.

Please note, all schemes are weather dependent and may be cancelled or rescheduled if weather conditions are not favourable.

A free Road Work Alerts service is available from our website: www.setrunkroads.co.uk

An email address is all that is required to sign up for the service.

Real-time journey information can be obtained by visiting www.trafficscotland.org  or via Twitter: @TrafficScotland

To report a problem on the network please visit: http://setrunkroads.co.uk/report-a-problem/