M876 at Dennyloanhead

18 November 2019

Overnight Maintenance

ESSENTIAL MAINTENANCE ON M876 DENNYLOANHEAD COMMENCES 18th NOVEMBER

Parapet replacement work will take place overnight on the M876 at Dennyloanhead from Monday 18th November until Thursday 5th December 2019, between 8pm and 6am, each night.

This work, with a value of around £42,000 will improve the condition of the bridge at this location, benefitting around 40,000 vehicles using this route each day, and reducing the need for future more extensive maintenance.

This work requires a closure of Lane 1 and the hard shoulder of each carriageway between the M80 Junction 8 and M876 Junction 1 in a phased manner.

This scheme has been planned in consultation with Transport Scotland, Traffic Scotland, the emergency services, bus operating companies, and Falkirk Council.

Please note, all schemes are weather dependent and may be cancelled or rescheduled if weather conditions are not favourable.

A free Road Work Alerts service is available from our website: www.setrunkroads.co.uk

An email address is all that is required to sign up for the service.

Real-time journey information can be obtained by visiting www.trafficscotland.org  or via Twitter: @TrafficScotland

To report a problem on the network please visit: http://setrunkroads.co.uk/report-a-problem/